Plan a commercial real estate development project with a Gantt chart. Track site acquisition, entitlements, design, construction, and lease-up in one visual timeline.
Commercial real estate development projects—office buildings, retail centers, industrial parks, mixed-use towers—involve dozens of interdependent workstreams running simultaneously over 2-7 years. A developer managing a single $50M office project coordinates architects, civil engineers, geotechnical consultants, attorneys, lenders, city planners, general contractors, leasing brokers, and future tenants. Without a shared timeline, critical path items fall through the cracks.
The most expensive mistakes in CRE development are schedule mistakes. A 3-month delay in entitlements pushes your construction loan draw, increases carry costs, and risks losing an anchor tenant whose lease required occupancy by a specific date. Developers who track their schedule informally—in spreadsheets or email threads—consistently underestimate the time required for permitting and fail to protect their contingency periods.
A commercial real estate development Gantt chart maps every phase from site control through stabilized occupancy, makes the critical path visible, and lets your whole team—from equity partners to the GC—see where the project stands. gantt-chart.io lets CRE developers build and share this schedule without the complexity of enterprise project management software.
Before building your commercial real estate development Gantt chart:
Certificate of Occupancy as the hard red milestone. Add Construction Loan Closing and Lease Execution — Anchor Tenant as orange milestones.LOI negotiation and execution — 2-4 weeksPurchase and sale agreement negotiation — 3-6 weeksFeasibility period / due diligence — 30-60 days; hard deadline per PSATitle review and curative work — runs concurrent with feasibilityEnvironmental Phase I / Phase II — Phase I takes 3-4 weeks; Phase II if needed adds 6-10 weeksSurvey and boundary review — 2-3 weeksGeotechnical investigation — 3-5 weeksHard deposit goes non-refundable — milestoneSite closing — milestonePre-application meeting with planning department — 2-4 weeks to scheduleRezoning application submittal — if required; 3-9 months for approvalSite plan / design review application — 4-12 weeks for initial review cycleTraffic impact study — 6-10 weeksEnvironmental review (CEQA/NEPA if applicable) — 3-18 months depending on complexityUtility coordination (water, sewer, power, gas) — 3-6 months for service agreementsBuilding permit application submittal — after design is completeBuilding permit issued — milestoneSchematic design — 6-10 weeksDesign development — 8-12 weeksConstruction documents — 50% CD — milestoneConstruction documents — 100% CD — milestoneGC pricing / bid period — 4-8 weeksValue engineering — 2-4 weeksConstruction documents — permit set — milestoneConstruction loan term sheet — 2-4 weeksLender due diligence period — 30-60 daysAppraisal — 4-6 weeksConstruction loan closing — milestoneEquity funding confirmation — milestoneFirst draw request — milestone; typically at construction startSite work and demolition — 4-12 weeksFoundation and underground utilities — 6-16 weeksStructural frame — varies widely; 3-12 months for multi-storySkin / envelope closure — 2-6 monthsMEP rough-in — 3-6 monthsInterior finishes — core and shell — 2-4 monthsTenant improvement construction — 2-4 months (may overlap)Substantial completion — milestoneCertificate of Occupancy — milestone| Milestone | Typical Timing |
|-----------|----------------|
| Site under contract | Month 1 |
| Feasibility period expires | Month 2-3 |
| Site closing | Month 3-5 |
| Building permit issued | Month 12-24 |
| Construction loan closes | Month 14-26 |
| Construction start | Month 15-28 |
| Structural topping out | Month 24-36 |
| Substantial completion | Month 36-54 |
| Certificate of Occupancy | Month 38-56 |
| Stabilized occupancy (90%+ leased) | Month 44-66 |
gantt-chart.io includes a commercial real estate development template with all the task groups above pre-loaded. Open it, adjust dates to match your actual schedule and jurisdiction, and share the link with your equity partners, lender, and GC.