Every customer-visible change to gantt-chart.io, newest first.
Pictures and PowerPoint slides
Download the plan as a PNG or SVG picture: workstreams, bars on their real dates, progress, milestones and dependency arrows.
Download the plan as PowerPoint slides. Bars, milestones, labels and arrows are editable shapes, and each slide's speaker notes list its tasks with dates, owner and progress.
Microsoft Project files with phases inside phases keep both levels: the top phase becomes the workstream and the sub-phase a group inside it.
Calendar dates, Microsoft Project export and a clearer detail panel
Pin a plan to a start date so every task shows real calendar dates.
Export to Microsoft Project XML with dates, dependencies and owners. CSV exports carry start and finish dates and keep spreadsheet formulas from running.
Dependency lag is entered and shown in days.
Detail panel: duration in days, an owner picker, tags as chips, colour swatches, and predecessors and successors in plain words.
Table view edits task names and dates in place; summary bars show rolled-up progress; the Today marker is easier to read.
API reference at /docs/api with an OpenAPI file; API tasks are measured in days.
The weekly status report is reachable from More actions on phones.
Templates, embeds and comparisons
60 industry Gantt templates that open as live, editable plans.
Share or embed a plan from your first visit, and embeds now load on other sites.
Comparison pages for Microsoft Project, Wrike and ClickUp, plus five use-case pages.
The Free plan saves one project; downloads are part of Solo.
Plans from a brief land on the right days
Plans generated from a brief keep their true day scale, including week-long steps and work that runs in parallel.
Briefs without dates are fitted to the horizon you ask for.
The playhead marker shows its real date.
Google Sheets import saves to your account
Rows imported from Google Sheets are saved to your signed-in project.
Live demo
/demo opens the full Gantt app with a sample plan, no account needed.
Open a plan in flow-chart.io
Send a Gantt plan to flow-chart.io and work on it as a process diagram.
Baselines and critical paths
Schedule variance is measured against the baseline you captured.
The critical path includes every tied path, and edits cascade to dependent tasks.
The new Gantt board
Drag from one bar to another to link them, and preview a change before you commit it.
ISO dates and what-if scenarios you can compare side by side.
Moves skip weekends when they cascade, and the A4 print layout includes a legend.
Imports, status reports and Brand DNA
Import plans from Smartsheet and Microsoft Project XML.
Weekly and quarterly status reports from your plan.
Paste a task list and get a weekly status you can share by link, without an account.
Brand DNA Studio turns your brand's colours into Gantt chart templates.
Dependency-aware AI schedules
AI-generated schedules respect task dependencies.
The schedule assistant answers from your own plan's data.