Make your timeline
The example is a one-day event. Change any row, or delete them and start with your own steps.
| # | Task | Phase | Days | Starts after | Remove |
|---|---|---|---|---|---|
| 1 | |||||
| 2 | |||||
| 3 | |||||
| 4 | |||||
| 5 | |||||
| 6 | |||||
| 7 | |||||
| 8 | |||||
| 9 |
Your timeline
9 tasks, 34 days from start to finish. Darker bars are the critical path: a day lost on any of them moves the finish date.
How to make a timeline here
- Name the timeline. Type a name for the project or event at the top. It becomes the project name if you open the timeline in the editor.
- Add the steps. Replace the example rows with your own steps. Give each a group (such as Plan or Promotion) and a length in days.
- Say what each step waits for. In Starts after, pick the step that has to finish first. Steps left on day 1 run in parallel from the start, so the timeline shows what can overlap.
- Open, share or save. Open in the editor to add milestones, owners and real dates, or switch to the calendar and board views. Save it free to keep it in an account.
A timeline that keeps itself up to date
A timeline drawn in a slide or a drawing tool is a picture. It is right on the day it is made, and every change after that means moving boxes by hand. Here each step records what it waits for, so its start is worked out for you. Make the venue booking two days longer and everything that depends on it moves; the steps that do not depend on it stay put.
The links also show which steps set the end date. When some work runs in parallel, the darker bars are the critical path: lose a day on one of them and the whole timeline finishes a day later. The lighter bars have room to slip. That is the first thing to check when someone asks whether a date is safe.
Keep steps between a day and two weeks long. Longer steps hide problems until late; very short ones make the timeline hard to read. Use one-day steps for the moments people care about, such as a sign-off or the event itself.
What's free, and what needs an account
| What you want to do | What it takes |
|---|---|
| Make and change the timeline on this page | Nothing. No account, no card. |
| Open it in the editor: real dates, milestones, owners, calendar and board views | Nothing. It stays in this browser until you sign in. |
| Save it and open it on another device | A free account, with an email sign-in link. |
| Download as PDF, PNG, PowerPoint or CSV | Solo, $12/month. |
Start from a timeline template instead
If you would rather not start from a blank list, the timeline templates have ready-made timelines for projects, events, product roadmaps, marketing campaigns and construction, each with real steps, lengths and links. The project timeline template is the general one, with milestones for each phase.
Frequently asked questions
- Is this timeline maker free?
- Yes. Making the timeline on this page and in the editor needs no account and no card. A free account keeps 1 saved project. Downloads (PDF, PNG, PowerPoint, CSV) are on Solo at $12/month.
- What kind of timeline does it make?
- A project or event timeline: each step is a bar with a start and a length, grouped into lanes, with links that show what waits for what. If you need a history or biography timeline of dated events with pictures, a drawing or slide tool is a better fit.
- How do I make a timeline with dates?
- Build the steps here, then open the timeline in the editor and set the start date. Every step gets a calendar date from its links, and the dates move when a step gets longer or shorter.
- Can I share the timeline?
- Yes. In the editor, create a read-only share link. People open it in a browser without an account. A link shows the timeline as it was when you made it, so make a new one after big changes.
- Is my timeline sent anywhere while I build it?
- No. The timeline on this page is worked out in your browser. It is only sent to gantt-chart.io when you sign in to save it.