Pick a timeline template
Each preview shows the phases of the timeline from first step to last. Use this template opens the full timeline, every step included, in the editor. The template page has the step-by-step table and a CSV download.
Project Timeline timeline
A milestone-driven project timeline: phases on lanes, sign-offs as milestones, and links that keep the dates honest when something moves.
14 steps in 5 phases, about 8 weeks from start to finish.
Project Plan timeline
A complete project plan, from charter to closure report, laid out as a Gantt chart so the dates move when the work does.
19 steps in 5 phases, about 8 weeks from start to finish.
Product Launch Plan timeline
A cross-functional launch plan where product, marketing, sales and support each have a lane and every hand-off between them is a visible dependency.
18 steps in 6 phases, about 7 weeks from start to finish.
Marketing Campaign Plan timeline
A multi-channel campaign from brief to results report, with creative approval as the gate every channel waits for.
17 steps in 5 phases, about 9 weeks from start to finish.
Project Roadmap timeline
A five-month roadmap for a change that spans several teams: workstreams as lanes, decision gates between them, and the dependencies that set the pace.
14 steps in 6 phases, about 5 months from start to finish.
12-Month Project Plan timeline
A year-long plan laid out in months and quarters, for programmes and annual projects where weekly detail would be noise.
11 steps in 4 phases, about 9 months from start to finish.
Event Planning Timeline timeline
From budget sign-off to post-event survey, with the venue and vendor deadlines that can't move.
15 steps in 5 phases, about 12 weeks from start to finish.
Construction Schedule timeline
A sequenced building schedule from permits to certificate of occupancy, with inspection gates between the trades.
21 steps in 6 phases, about 5 months from start to finish.
How to make a timeline from a template
- Pick the closest template. Choose the timeline below that is nearest to your project. A close match saves more time than a perfect blank one.
- Open it. Click Use this template. The timeline opens in the editor with its phases as lanes and its links drawn. No account is needed.
- Rename and resize the steps. Change the step names to yours and set how long each takes. Steps that wait for others move by themselves.
- Set the dates and share. Set the start date, then share a read-only link or sign in free to keep the timeline.
What a good timeline template gives you
A timeline template is only useful if its steps are the ones your project will really have. Each template here lists specific steps for its kind of work (booking the venue, the feature freeze before a beta, the foundation cure and inspection), not placeholders like "Phase 1". Lengths are working examples to replace with your own estimates.
Most of these timelines are also linked: a step that has to wait for another starts when that one finishes, and steps that can run at the same time overlap. (The event and construction timelines are one step after another; link the steps that can overlap once you open them.) That is the difference between a timeline you can keep using and one you redraw every time something slips: change a length and the dates after it move, while unrelated work stays where it is.
Every template marks its critical path, the chain of steps that sets the end date. When someone asks whether a date is safe, those are the steps to look at first.
Which timeline template to use
| If you are planning | Start with |
|---|---|
| Any project you need to show stakeholders | Project timeline |
| A project with scope, budget and risks to agree first | Project plan |
| A product launch across product, marketing, sales and support | Product launch |
| Features and releases for a product | Product roadmap |
| A year of work you review month by month | Monthly project plan |
| A meeting, launch party or conference | Event planning |
| A change across several teams over months | Project roadmap |
| A campaign across several channels | Marketing campaign |
| A building or renovation job | Construction schedule |
| A thesis or dissertation | Thesis timeline |
Nothing close? Build one from scratch with the free timeline maker, or browse all Gantt chart templates by industry.
Frequently asked questions
- What is a timeline template?
- A ready-made timeline with the usual steps of a kind of project already laid out in order, with example lengths. You replace the steps and lengths with your own instead of starting from a blank page.
- Are these timeline templates free?
- Yes. Every template opens in the editor for free with no sign-up, and every template page has a free CSV download for Excel or Google Sheets.
- Can I use a timeline template in Excel, Word or PowerPoint?
- Download the CSV from any template page and open it in Excel or Google Sheets. On the Solo plan the editor also downloads the timeline as a PowerPoint file, an image or a PDF.
- What is the difference between a timeline and a Gantt chart?
- A basic timeline marks events along a line. A Gantt chart draws each step as a bar with a start and an end, in lanes, with links between steps. These templates are drawn as Gantt-style timelines so lengths and overlaps are visible.
- Do you have templates for history or school timelines?
- No. These are planning timelines for work that has not happened yet: projects, events and campaigns. For a timeline of past dates, a drawing or slide tool is a better fit.