How to Plan a Packaging Redesign Project

Packaging redesigns touch design, engineering, supplier qualification, regulatory review, and production changeover simultaneously. Here's the Gantt chart template.

How to Plan a Packaging Redesign Project


The Problem: Packaging Projects Miss Launch Dates

Packaging redesigns routinely miss their target launch date because the timeline underestimates the number of approvals required. Brand approvals, legal reviews, regulatory submissions, supplier qualifications, and production trials all need to happen in a specific sequence — and each one takes longer than expected when it's not tracked as a project task.

The second problem is scope miscommunication. Marketing is designing for aesthetics while operations is focused on structural performance. Regulatory is reviewing label copy while procurement is negotiating with a new supplier. Nobody sees the full picture, so dependencies between workstreams are invisible until they cause a delay.

A packaging redesign Gantt chart makes the full scope visible — structural design, graphic design, regulatory, supplier, and production changeover all in one timeline. gantt-chart.io gives your marketing, operations, and supply chain teams a shared project view so every approval, qualification, and trial is tracked as a task with an owner and a deadline.


Prerequisites


Packaging Redesign Gantt Chart Template

Phase 1: Brief and Scope Definition (Weeks 1–2)

Phase 2: Structural Design (Weeks 2–7)

Phase 3: Graphic Design (Weeks 3–9, parallel with structural)

Phase 4: Regulatory Submission (Weeks 7–14, if applicable)

Phase 5: Supplier Qualification (Weeks 6–12)

Phase 6: Production Changeover (Weeks 12–16)


Common Mistakes

1. Graphic and structural design running fully in sequence. Structural and graphic design should run largely in parallel, with clear hand-offs at defined milestones. Sequential execution adds 4–6 weeks to the timeline unnecessarily.

2. Regulatory review as an afterthought. Legal and regulatory review of label copy must happen before final artwork is sent to production. Regulatory changes after final art approval mean a complete artwork revision cycle.

3. No supplier production trial. Approving new packaging based on samples without a production trial at the supplier is how quality problems are discovered after the first commercial run.

4. Inventory transition not planned. Going live with new packaging while thousands of units of old packaging are in stock creates a write-off or a confusing mixed-packaging period in market. Plan the transition inventory drawdown.

5. Launch date set before regulatory clearance timeline is known. If the product requires FDA or other regulatory clearance, the clearance timeline gates everything else. Confirm the regulatory timeline before setting the launch date.


Quick-Start in gantt-chart.io

  1. Open gantt-chart.io and create a project called "Packaging Redesign — [Product Name]"
  2. Add the six phases with parallel tracks for structural design, graphic design, and regulatory
  3. Set regulatory clearance as a hard gate before production changeover begins
  4. Assign brand lead to Phase 3, packaging engineer to Phase 2, and procurement to Phase 5
  5. Mark the production changeover date as a milestone that triggers inventory transition planning

FAQ

How long does a full packaging redesign take?

16–20 weeks for a standard redesign without regulatory submissions. 20–28 weeks when regulatory submissions (FDA, EU) are required. Structural tooling can add 4–8 weeks if new molds are needed.

Do we need consumer research before selecting a graphic direction?

For significant redesigns that affect brand recognition, yes — particularly if you're changing color, logo placement, or key visual equity. For minor refreshes, internal alignment is sufficient.

When do we tell retailers about the redesign?

At least 12 weeks before the new packaging ships to their distribution centers. Major retailers may have planogram reset schedules that determine when new packaging can appear on shelf.

What's a first article inspection?

A formal review of the first production run against approved specifications. It happens before the full production run is released. It catches machine setup errors, color shifts, and die cut variations before they affect the entire run.

How do we handle mixed old and new packaging in the market?

Communicate to your sales team and key retailers before the transition. Plan to sell through old packaging from existing inventory before the new arrives in market — stagger ship dates if needed.


Packaging redesigns succeed when every function — brand, engineering, regulatory, supplier, and production — works from a shared timeline with clear dependencies. Build your redesign project in gantt-chart.io, run structural and graphic design in parallel, and treat regulatory clearance as the hard gate it is.