Schedule your film or video production with a Gantt chart. Track pre-production, shoot days, and post from script to delivery. Free browser tool, no sign-up required.
A shoot day is the most expensive line item in any production budget. When the location isn't confirmed, the actor hasn't done a wardrobe fitting, or the equipment rental wasn't extended, you pay for standby time, re-scheduling fees, and crew overtime. These failures almost always trace back to a planning problem that was visible weeks earlier—but nobody had a timeline that showed the dependencies.
Pre-production tasks are sequential and fragile. Script lock must precede casting. Casting must precede wardrobe. Location scouting must precede shot list finalization. Post-production can't begin until picture lock. None of this fits on a checklist.
A film shoot schedule Gantt chart puts every department's tasks on a shared timeline so the production coordinator, director, and producer can see at a glance whether they're on track—and what will break if any task slips. gantt-chart.io lets you build this in minutes, free, no sign-up, shareable with your full crew.
Before building your production Gantt chart:
| Task | Duration | Depends On |
|------|----------|------------|
| Script finalization and lock | 1–2 weeks | — |
| Budget breakdown | 3–5 days | Script lock |
| Director attachment | Parallel | Script lock |
| Distributor or platform alignment | 1 week | Budget, director |
Script lock is the critical path gate. Nothing downstream can fully commit until the script is final.
| Task | Duration | Depends On |
|------|----------|------------|
| Casting breakdown and auditions | 2–3 weeks | Script lock |
| Location scouting | 2 weeks | Script lock, budget |
| Location permits | 2–4 weeks | Location selection |
| Department head hiring (DP, AD, production designer) | 1 week | Budget approved |
| Shot list and storyboards | 1–2 weeks | Director, locations confirmed |
| Equipment rental quotes | 1 week | Shot list |
| Wardrobe fittings | 1 week | Casting confirmed |
| Production design and set build | 2–4 weeks | Locations, budget |
| Rehearsals | 2–5 days | Casting locked, script final |
| Call sheet templates and scheduling | Parallel | AD hired |
The longest path here is typically permitting—start it immediately after location selection.
| Task | Duration | Depends On |
|------|----------|------------|
| Company move days | Per schedule | All pre-pro complete |
| Interior shoot days | Per breakdown | Permits, crew |
| Exterior shoot days | Per breakdown | Weather contingency |
| Second unit or B-camera days | Parallel | A-camera schedule |
| Daily media offload and backup | Every shoot day | Shoot |
| Daily script supervisor notes | Every shoot day | Shoot |
Build a weather contingency day for any outdoor-heavy production. Plan for it, budget for it, and only release it if you don't need it.
| Task | Duration | Depends On |
|------|----------|------------|
| Media ingest and sync | 3–5 days | Wrap |
| Assembly cut | 2–4 weeks | Ingest complete |
| Director's cut | 1–2 weeks | Assembly |
| Picture lock | 1 week | Director's cut approved |
| VFX and motion graphics | 2–6 weeks | Picture lock |
| Color grading | 1–2 weeks | VFX complete |
| Sound design and mix | 2–3 weeks | Picture lock (parallel with color) |
| Score and music licensing | 2–4 weeks | Picture lock |
| Final QC | 3–5 days | All tracks complete |
| Delivery and deliverables package | 3–5 days | QC approved |
Color and sound can run in parallel after picture lock—this is the single biggest schedule compression opportunity in post.
Not locking the script early enough. Departments do prep work based on draft assumptions, then redo it when the script changes. Lock it and commit.
Parallel pre-pro tasks that aren't actually parallel. Wardrobe can't start until casting is done. Shot list can't finalize until locations are confirmed. Check your dependencies.
Post compression after production overruns. Shoot days slip; delivery dates don't. Model the post schedule conservatively and protect it.
Open gantt-chart.io, paste in your phases, set your shoot start date, and share the link with your department heads. Free, browser-based, no account required.