Free, no sign-up to start: the plan opens as a live, editable Gantt chart. 14 tasks across 5 phases, about 8 weeks if every task runs in sequence.
What's in the template
| Phase | Task | Example duration |
|---|---|---|
| Design | Site assessment and measurements | 2 days |
| Design | Landscape design | 10 days |
| Design | Material and plant selection | 5 days |
| Prepare | Utility locate and marking | 3 days |
| Prepare | Removal and demolition | 3 days |
| Prepare | Grading and drainage | 4 days |
| Build | Patio, paths and walls | 10 days |
| Build | Irrigation installation | 3 days |
| Build | Lighting rough-in | 2 days |
| Plant | Soil preparation | 2 days |
| Plant | Trees and shrubs | 3 days |
| Plant | Beds and mulch | 3 days |
| Plant | Lawn seed or sod | 2 days |
| Close | Final walkthrough and care instructions | 1 day |
Durations are examples to replace with your own estimates, not benchmarks.
About this landscaping project
Landscaping has a natural order: mark buried utilities, fix grading and drainage, build hardscape such as patios and walls, run irrigation, and only then plant. Planting first means digging up new plants later.
It fits a residential or small commercial yard project. Weather and planting seasons will shift the dates.
Who it's for: Homeowners, landscape designers and landscaping contractors.
How to use it
- Open the plan. Click Open in the editor.
- Respect the season. Adjust durations so planting falls in a suitable season for your region.
- Add weather float. Lengthen grading and hardscape rows to allow for rain days.
- Share with the crew. Send a read-only link to the contractor and homeowner.
Planning tips
- Use your area's utility-locate service before digging.
- Fix drainage before building patios against the house.
- Plan watering for new plants right after planting.
Frequently asked questions
- What order should landscaping be done in?
- Typically utilities marked, removal, grading and drainage, hardscape, irrigation and lighting, then soil and planting.
- Can I plan a multi-season project?
- Yes. Plans can run up to two years.
- Is it free?
- Yes. Opening and editing the template is free.