Free, no sign-up to start: the plan opens as a live, editable Gantt chart. 12 tasks across 4 phases, about 4 weeks from start to finish with the parallel work shown.
What's in the template
| Phase | Task | Duration | Starts | Depends on |
|---|---|---|---|---|
| Plan | Define goals and scope | 2 days | Day 1 | Nothing (starts first) |
| Plan | Identify stakeholders | 1 day | Day 3 | Define goals and scope |
| Plan | Break work into tasks and estimates | 2 days | Day 4 | Identify stakeholders |
| Plan | Kickoff meeting | 1 day | Day 6 | Break work into tasks and estimates |
| Do | Workstream A | 10 days | Day 7 | Kickoff meeting |
| Do | Workstream B | 8 days | Day 7 | Kickoff meeting |
| Do | Midpoint check-in | 1 day | Day 15 | Workstream B |
| Do | Integrate the work | 4 days | Day 17 | Workstream A, Midpoint check-in |
| Check | Review and testing | 3 days | Day 21 | Integrate the work |
| Check | Stakeholder sign-off | 2 days | Day 24 | Review and testing |
| Close | Hand over and communicate | 2 days | Day 26 | Stakeholder sign-off |
| Close | Lessons learned | 1 day | Day 28 | Hand over and communicate |
Durations are examples to replace with your own estimates, not benchmarks. Some work runs in parallel, so the plan takes 28 days instead of the 37 it would take one task at a time. The 10 darker bars are the critical path: a day lost on any of them moves the finish date.
About this simple project plan
Not every project needs fifty tasks. This simple Gantt chart template has twelve: enough to show the shape of a project, who does what and what depends on what, without a long list to maintain. It follows the plan, do, check, close pattern that fits most small projects.
Use it for an internal project, a client job, a process change or anything that will take a few weeks and involves more than one person. Rename the tasks to match your work; the dependencies already make sense for most projects, so the dates will stay right as you edit.
If your project fits an industry, start from one of the specific templates instead. They have more detail for construction, software, events, marketing and other common projects.
Who it's for: Anyone who needs a basic project timeline quickly: team leads, small business owners, freelancers and students.
How to use it
- Use this template. Click Use this template. Twelve tasks open as a live Gantt chart in your browser; no sign-up is needed to start editing.
- Rename the workstreams. Workstream A and B are placeholders for the two main pieces of work. Rename them, split them into more tasks if you need to, and set realistic durations.
- Set your dates. Move the first task to your start date. Every later task moves with it, so the finish date is always current.
- Share or save. Share a read-only link with your team, or sign in free to keep the plan in your account.
What makes a simple Gantt chart useful
A Gantt chart shows three things at once: what has to be done, when, and what waits for what. Even a twelve-task chart answers the questions people actually ask, such as "when will this be done?" and "what happens if this slips?". The dependencies are what make it more than a list with dates: change one duration and the finish date updates.
This template runs two workstreams in parallel after the kickoff, then brings them together. That shape fits most small projects: two or three people or teams working on separate parts, then integrating, reviewing and handing over.
When to use a spreadsheet instead
If you need to send a static file, the Download CSV button gives you this plan as a spreadsheet with start dates, end dates and dependencies, and the Excel Gantt chart template guide shows how to draw it with conditional formatting. If the plan will change as the project runs, an online Gantt chart is less work to keep up to date, because dates move by themselves when a task changes.
Planning tips
- Keep tasks between two days and two weeks long. Longer tasks hide problems; shorter ones make the chart hard to read.
- Give every task one owner.
- Put the sign-off on the chart. Waiting for approval takes calendar time even when it takes no effort.
- Review the chart once a week and update progress, even if nothing has changed.
Frequently asked questions
- What is a simple Gantt chart?
- A simple Gantt chart is a list of tasks drawn as bars on a calendar, with each bar's length showing how long the task takes and lines showing which tasks depend on others. This template has twelve tasks in four phases.
- Is this simple Gantt chart template free?
- Yes. It opens in the editor without an account, and the CSV download on this page is free. A free account saves one project.
- Can I use it in Excel or Google Sheets?
- Yes. Download the CSV and open it in Excel or Google Sheets. The Excel and Google Sheets guides show how to turn the rows into bars.
- How do I add more tasks?
- In the editor, add a task and link it to the task it depends on. The chart and the finish date update straight away.
Related templates and guides
- Project Plan Gantt chart template
- Project Timeline Gantt chart template
- Weekly Project Plan Gantt chart template
- 12-Month Project Plan Gantt chart template
- Small Business Launch Plan Gantt chart template
- Smartsheet alternative
- Free Gantt chart maker, no sign-up
- Critical path calculator
- Free timeline templates