Free, no sign-up to start: the plan opens as a live, editable Gantt chart. 12 tasks across 4 phases, about 10 weeks if every task runs in sequence.
What's in the template
| Phase | Task | Example duration |
|---|---|---|
| Design | Site survey and roof check | 2 days |
| Design | System design and quote | 5 days |
| Design | Contract signed | 1 day |
| Approvals | Building and electrical permits | 15 days |
| Approvals | Utility interconnection application | 20 days |
| Install | Equipment delivery | 5 days |
| Install | Roof mounting and racking | 1 day |
| Install | Panel installation | 1 day |
| Install | Inverter and electrical work | 2 days |
| Commission | Local inspection | 5 days |
| Commission | Utility permission to operate | 10 days |
| Commission | System switch-on and monitoring setup | 1 day |
Durations are examples to replace with your own estimates, not benchmarks.
About this solar panel installation project
The physical install of a rooftop solar system is often quick. Permits, inspection and the utility's interconnection approval usually take longer, so this plan starts them early and shows them clearly.
Requirements vary by location and utility. Use the permit and interconnection rows as reminders to check what applies.
Who it's for: Homeowners, solar installers and small commercial building owners.
How to use it
- Open the plan. Click Open in the editor. The tasks load as a live Gantt chart without signing in.
- Ask your installer. Replace approval durations with the times your installer sees locally.
- Add battery storage. Add rows for a battery install if your system includes one.
- Share. Send a read-only link to your installer or household.
Planning tips
- Check roof condition first; replacing a roof after panels go on costs more.
- Don't switch the system on before the utility gives permission to operate.
- Keep permit and inspection records for warranty and resale.
Frequently asked questions
- How long does a solar installation take?
- The install itself is often a few days; approvals usually set the overall timeline. This example runs about two to three months.
- Is this electrical or legal advice?
- No. It is a planning template; follow your installer, utility and local authority.
- Is it free?
- Yes. Opening and editing the template is free, and a free account saves one project. Downloading the chart as PDF or CSV needs Solo.
Related templates
The free plan saves one project. Downloads (PDF, CSV) and more projects are on Solo, $12/month.